How to use hydraulic pile breaker?
The hydraulic pile breaker can use the power of the excavator. The power of the hydraulic station can also be used. Environmentally friendly full hydraulic drive. Low noise, static pressure construction, does not affect the quality of the pile body, and low personnel cost mainly depends on the operation of the excavator driver by one person. It can be equipped with another supervisor, and the safety construction staff is the driver of the excavator. The oil cylinder directly drives the drill rod without direct contact with the broken pile. Squeeze the pile at the same time. Cut off the pile head. In pile breaker construction, the operation is simple, the work efficiency is high, and the cost is low. It is suitable for pile group construction projects. The hydraulic concrete breaker adopts a highly modular combination. By connecting the modules with the pin shaft, the pile cutting machine provides pressure to the multiple cylinders of the pile breaker through the power source. The pile cutting machine can combine different numbers of modules to cut the pile heads within a certain range, and the hydraulic concrete breaker cuts the piles such as cast-in-place piles. Prefabricated piles, etc.; from the shape of the pile-cutting head, they are widely used in industrial and civil construction pile foundation projects.
Why should the pile head be broken?
In order to make the foundation of the building stronger, the pile head is generally exposed to part of the ground during pile driving. Before construction on the ground, the pile heads on the exposed ground should be broken. This broken is the pile cutter machine. The hydraulic pile cutter is used to break piles in tall buildings. As we all know, the construction of tall buildings requires pile driving. Piling is done by using a pile cutter machine. Carry out pile driving, then excavate the foundation after pile driving, after excavating the foundation. It is necessary to carry out measuring and laying out, carry out measuring construction, and then digging the pit machine for about the same time, it is necessary to start the construction of the broken pile. The scientific name of pile cutter machine is hydraulic pile breaker. Why do we need to break the pile head, because the concrete on the pile head should be removed. Then after the concrete is removed, the steel bars of the pile foundation must be reserved. As long as the steel bars of the pile foundation are exposed, the steel bars are connected to the trenches of the tall buildings, and then the concrete is poured to make the pile foundation strong.
Pile cutter manufacturer — YG Machinery
Nowadays, hydraulic pile breaker has come out. It is a new, fast and efficient concrete structure demolition tool invented by combining the characteristics of concrete structure itself. It greatly reduces the labor intensity of workers and improves work efficiency. Combined with the concrete breaker machine method, it takes only a few minutes to cut off a pile head. And using non-blasting technology, clean, silent operation, no environmental disturbance, vibration, impact, flying rocks, dust, gun sound, is an economical, safe and environmentally friendly operation method. Hydraulic pile breaker is more suitable for current construction needs. If you want to know more information about pile cutter, YG Machinery will provide you with more information. You can send questions or needs to admin@ygroadmachine.com.
Comments
Post a Comment